  • The construction of AWC building will be taken up under MGNREGS using appropriate building technologies, through muster rolls as per MGNREGA process
  • Under MGNREGA expenditure up to Rs. 5 lakhs will be allowed for construction of an AWC building. Beyond this, the expenditure will be borne from the ICDS scheme of the MWCD, including finishing of the building consisting of flooring, painting, plumbing, electrification and wood work etc., as a separate work. For this purpose, concerned authorities at District/ Block level shall release the funds, to the PIA concerned. Apart from this, funds from State Finance Commission, Scheduled Castes Sub plan (SCSP), Tribal Sub Plan (TSP), l4th Finance Commission (for water supply & sanitation) or any other suitable scheme may be used for the construction of a AWC building.
  • The Ministry of Panchayat Raj would facilitate to provide drinking water facilities and sanitation structures at the AWC wherever the gaps regarding these facilities exist.

Leave a Reply

Your email address will not be published. Required fields are marked *